
AdBlue :: 4000 litre Slimline Titan BlueStore System
4000 Litre Storage System consisting of Bunded Tank, Todo Coupling and a PIUSI Transfer Pump with automatic Nozzle.
All of our AdBlue storage systems are engineered from suitable materials ensuring that the product quality is not compromised by coming into contact with incorrect materials of construction.
The slimline tank profile allows for it to be located on to a fuelling island as narrow as 1.2m.
Failure to handle AdBlue with the correct equipment may result in a catastrophic event such as premature SCR failure across your fleet. For information on how to avoid this costly occurrence view our Handling Guidelines
Specification |
Tank | Rotationally Molded HDPE Tank with External Bund |
Volume | 4000 litre (nominal capacity) |
Colour | Blue |
Insulation | At base set in between inner tank and outer bund |
Heating | None |
Venting | Static Vent |

Equipment | |
Pump | 35 litre/min 230v AC membrane pump |
Flowmeter | Turbine Meter with electronic display and 10:100 pulse output (Accuracy ±1%) |
Delivery Hose | 4m x 19mm Peroxide Cured Delivery Hose |
Nozzle | Stainless Steel Automatic Nozzle |
Gauging | 4-20mA Level Sensor with Local Display calibrated in litres |
Spill Protection: |
• 50mm Spill Free TODO Fill Coupling |
• Overfill Warning | |
• Bund Alarm | |
Optional Extras: | 8m hose reel fitted |
Endress and Hauser Fieldgate GSM |

Dimensions | Height: | 2340mm | |
Width | 1200mm | ||
Length | 3900mm |
All of our AdBlue storage tanks are available with optional ventilation/trace heating for applications which are to be employed in to extreme environments, please contact us for more information.
Installation
Tank is supplied ready to be installed, simply offload and connect 230v 13A supply to switch box on tank. Tank should be installed on to a suitable prepared base (solid, non-combustible and able to support the weight of the tank when full, ie: existing yard concrete or tarmac).
Environmental Responsibility
AdBlue is delivered into the tank under pressure. In the highly unlikely event of a spill occurring during filling, you will need to ensure that there is either a running water supply, pressure wash equipment or other spill response planning (spill kit & eyebath) available before we are able to fill the tank, our site inspector will undertake the necessary risk assessment on site before we commence filling. There is no charge for the inspection/risk assessment.
Service
Commercial Fuel Solutions Ltd ensure that all members of the technical sales and customer support teams are fully trained on the installation, operation and service requirements of all our products. Technical Support is available 24 hours a day, 365 days a year via our support number 0845 189 9880. A suitably qualified engineer is on call at all times during out of office hours. 12 month on site service warranty is included with the purchase of the tank.
Datasheet | ![]() |
![]() |
![]() |